Non-Profit · Irwin, PA · 2025

First Presbyterian Church Addition

A 10,828 square foot church addition delivered through Fort’s full scope: design, plans, permitting, site development, and construction.

Sector

Non-profit · Religious

Location

Irwin, PA

Size

10,828 sq ft

Completed

2025

Delivery

Design-Build · Full scope

In-house scope

Design · Plans · Permitting · Site development · Construction

For First Presbyterian in Irwin, Fort delivered a 10,828 square foot addition with its complete Design-Build scope: the design, the plans and permitting, the site development, and the construction. Completed in 2025, it is the most recent chapter in Fort’s long-running Pennsylvania work.

The challenge

Adding to a building a congregation never leaves

A church addition has to join an existing building both structurally and architecturally, respecting a structure a congregation has worshipped in for generations while meeting today’s code. And the church does not close for construction; the work proceeds around an active congregation’s calendar.

Our approach

Design through construction, one team

Fort designed the addition to belong to the building it joins, carried the plans through permitting, developed the site, and built it, with the congregation dealing with one accountable team from concept to completion.

The outcome

Room to grow, delivered in 2025

The addition was completed in 2025, giving the congregation nearly 11,000 square feet of new space. Nearly a decade after the Ligonier Valley YMCA expansion, it shows Fort’s Pennsylvania relationships still producing work, even as the firm’s center of gravity has moved to Southwest Florida.